|
2010
CE COURSES HAVE BEEN APPROVED BY THE BOARD
The State of North Carolina requires licensed contractors to have at least
six
continuing education hours annually prior to annual license renewal on January
1st
NEW RALEIGH CLASS LOCATION!
35% DISCOUNT
ON WRIGHTSOFT LOAD ESTIMATING SOFTWARE
ENROLL EARLY, SEATING IS LIMITED . . .
Enroll
Now
or Call
800-317-7095
Download
2010 CE Enrollment Form
CE
Enrollment Form
|
2010 Course Date |
Course Description |
CEU |
City |
Location
(Click on Link For Map) |
|
September 10, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
September 17, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
September 24, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |
|
September 30, 2010 |
Part
I - Duct Design Principles
Part II - Air Distribution System Design
Part III - Variable Volume Duct Systems |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
October 1, 2010 |
Part I - Load
Estimating using ACCA Manual J-8
Part II - Using Load Estimating Software - Right-J-8
Part III - Manual-S Commercial Load Calculating |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
October 7, 2010 |
Part
I - Duct Design Principles
Part II - Air Distribution System Design
Part III - Variable Volume Duct Systems |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
October 8, 2010 |
Part I - Load
Estimating using ACCA Manual J-8
Part II - Using Load Estimating Software - Right-J-8
Part III - Manual-S Commercial Load Calculating |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
October 14, 2010 |
Part
I - Duct Design Principles
Part II - Air Distribution System Design
Part III - Variable Volume Duct Systems |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |
|
October 15, 2010 |
Part I - Load
Estimating using ACCA Manual J-8
Part II - Using Load Estimating Software - Right-J-8
Part III - Manual-S Commercial Load Calculating |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |
|
October 21, 2010 |
Part I - 2009 Fuel Gas Code -General Regulations, Ch. 3
Part II - 2009 Fuel Gas Code -Piping & Networks, Ch. 4
Part III - 2009 Fuel Gas Code-Venting Requirements &
Applications |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
October 22, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
October 28, 2010 |
Part I - 2009 Fuel Gas Code -General Regulations, Ch. 3
Part II - 2009 Fuel Gas Code -Piping & Networks, Ch. 4
Part III - 2009 Fuel Gas Code-Venting Requirements &
Applications |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
October 29, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
November 4, 2010 |
Part I - 2009 Fuel Gas Code -General Regulations, Ch. 3
Part II - 2009 Fuel Gas Code -Piping & Networks, Ch. 4
Part III - 2009 Fuel Gas Code-Venting Requirements &
Applications |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |
|
November 5, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |
|
November 11, 2010 |
Part
I - Duct Design Principles
Part II - Air Distribution System Design
Part III - Variable Volume Duct Systems |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
November 12, 2010 |
Part I - Load
Estimating using ACCA Manual J-8
Part II - Using Load Estimating Software - Right-J-8
Part III - Manual-S Commercial Load Calculating |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
November 18, 2010 |
Part
I - Duct Design Principles
Part II - Air Distribution System Design
Part III - Variable Volume Duct Systems |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
November 19, 2010 |
Part I - Load
Estimating using ACCA Manual J-8
Part II - Using Load Estimating Software - Right-J-8
Part III - Manual-S Commercial Load Calculating |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
December 2, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing
and Heating
Appliances, Part I, II & III
(Approved f/ All Licenses)
|
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |
|
December 3, 2010 |
Part
I - Duct Design Principles
Part II - Air Distribution System Design
Part III - Variable Volume Duct Systems |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610r |
|
December 9, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
December 10, 2010 |
Part I - 2009 Fuel Gas Code -General Regulations, Ch. 3
Part II - 2009 Fuel Gas Code -Piping & Networks, Ch. 4
Part III - 2009 Fuel Gas Code-Venting Requirements &
Applications |
6 |
Charlotte |
PSNC Energy -
Gastonia |
|
December 28, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Greensboro |
Piedmont
Natural Gas - Greensboro |
|
December 29, 2010 |
OSHA
Safety Course - Safe Use of Test
Equipment - Plumbing and Heating
Appliances, Part I, II & III ( For All License Classifications) |
6 |
Raleigh |
Trane
Corporation
4000 Business Park
Drive-Suite 105
Raleigh, NC 27610 |

NEW
2010 CE Course!
Residential and Light Commercial Load Estimating, Part I, II & III
Demo software will be
utilized during this course, please bring your personal laptop to this class.
Wrightsoft provides TTI students with a generous 35% discount off the list
price of all programs
and
packages. All purchases include
the software manual,
quick start guide, training video CD, free
tech support and a 30
day money back guarantee:
www.wrightsoft.com
Session #1)
9:00am – 11:00am
Load
Estimating - Manual J8 AE - (Ref. 2009 NC Energy Code, Chapter 4)
1. Types
of heating and cooling loads
2. Making
an accurate load estimate
3. Components
of heating and cooling loads
4. Manual
– J8 AE forms
Session #2)
11:00am – 1:00pm
Right-J8
Software Applications
1. Project
information
2. Selecting
/ building construction assemblies
3. Selecting
load preferences & infiltration
4. Entering
heat transfer areas manually
5. Right-Draw
heat transfer surface entry
6. Duct
load and duct system types
Session #3)
1:30pm – 5:00pm
Manual – S
Equipment Selection (Ref. 2009 NC Energy Code, Chapter 4 & 5)
1. Cooling
Equipment Selection
2. Air-source
Heat Pump Selection
3. Furnace
and Boiler Selection
4. Dual
Fuel Systems
5. Variable
Speed Equipment
6. ARI
Data
7. Manufacturers
Application Data

NEW
2010 CE Course!
OSHA Safety Course -
Safe Use of Testing Equipment & Tools - Part I, II & III
Session
One: 9:00 am -12:00 am
OSHA- Heating and Plumbing Equipment & Appliances- Part I
1. Selection
proper test equipment and tools OSHA 1926.300
2. Selection
of personal protection equipment - OSHA 1926.95
3. Operation
of test equipment – OSHA 1926.431
4. Testing
pressurized pipes and systems safely - OSHA 1926.102
Session Two: 12:30 am-2:30 pm
OSHA-Servicing Equipment & Appliances-Part II
1. Elevated
structures – service and test procedures – OSHA 1926.454
2. Roofs
and platforms – service and test procedures – OSHA 1926.104
3. Scaffolds
and ladders – service and test procedures – OSHA 1926.451
Session three: 2:30 pm-5:00 pm
OSHA-Safe Use of Test Equipment - Equipment & Appliances-Part III
1. Test
equipment for control systems – application and proper use
2. Test
equipment for flow control – measurement and proper use
3. Test
equipment for pressurized systems – application and proper use
4. Test
equipment for fuel gas – application and proper use
5. Test
equipment for vent systems – application and proper use

NEW
2010 CE Course!
Duct System Design Fundamentals, Part I, II & III
Session #1)
9:00am – 11:00am
Basic Duct
System Principals - 2009 NC Energy Code, Chapter 4
1. Blower
performance
2. Duct
performance
3. System
operating points
4. Pressure
drop and friction rate
Session #2)
11:00am – 1:00pm
Air
Distribution System Design - 2009 NC Mechanical Code, Chapter 6
1. Room-by-room
load estimate
2. Equipment
selection
3. Fittings
and duct geometry
4. Duct
sizing calculations
Session #3)
1:00pm – 3:00pm
Variable
Volume Duct Systems - 2009 NC Mechanical Code, Chapter 6
1. Zoning
basics – load profiles
2. Equipment
airflow issues
3. Operating
points for constant volume blowers
4. Operating
points for variable volume blowers
5. Bypass
air issues
6. Wireless
zoning products

NEW 2010 CE Course!
2009 NC Fuel Gas Code Regulation & Applications, Part I, II & III
Session
#1) 9:00am – 11:00am
2009 NC
Fuel Gas Code -Chapter 3; General Regulations
1. Appliance
installation requirements
2. Calculating
combustion air
3. Appliance
protection
4. Prohibited
locations
Session
#2) 11:00am – 1:00pm
2009 NC
Fuel Gas Code - Chapter 4; Gas Piping
1. Sizing
gas pipe networks
2. Installation
requirements and connected load
3. Pipe
material and specifications
4. Pipe
installation requirements
Session
#3) 1:00pm – 3:00pm
2009 NC
Fuel Gas Code - Chapter 5; Venting
1. Required
vent systems
2. Chimney
terminations
3. Category
I appliances
4. Category
II, III, VI appliances
5. Single
wall pipe applications
6. Multiple
appliances
Call
800-317-7095 or click here to
enroll
now
|